Corps of Engineers/FEMA Documents

Fargo-Moorhead Final FEMA/USACE Coordination Plan

Doc Date:  April 14, 2015

Editor’s Notes:  Coordination plan outlines the Floodplain Management Requirements, FEMA Flood Insurance Study, Modeling and other impacts that are required for CLOMR Application.

Project Refinements

Doc Date:  estimated August 1, 2012

Editor’s note:  FM Diversion Project refinements of Plan A to Limit Impacts

Studies

Editor’s Note:  The purpose of these studies were to analyze the disruptions to roadway system as a result of the FM Diversion Project.  This will involve analyzing the resulting impacts these disruptions have on roadway users and formulate recommendations intended to mitigate these impacts.  This study employed a public input-centric approach that focused on consensus and relationship building.

February and March 2012 Inundation Reports

Post-Feasibility Reports

Doc date: October 10, 2012

Editor’s notes:  This study, referred to as the Post-Feasibility Southern Alignment Analysis (PFSAA) evaluates and compares several alternative alignments to the FRP that have the potential to increase project value by further optimizing the project functionality for the estimated cost and impacts. The analysis generally includes alternative alignments and features for the area upstream of the Sheyenne River aqueduct site, including staging and storage areas. These are referred to as the southern alignment alternatives.

Organizational Documents

  • Joint Powers Agreement (June 2016)
    • Doc Date:  June 1, 2016
    • Editor’s notes:   JPA between City of Moorhead, City of Fargo, Clay County-MN, Cass County-ND and Cass County Joint Water Resource District (CCJWRD)

Other Projects and Environmental Assessments

 

Similar Posts: