The levee would be constructed in accordance with the US Army Corps of Engineers (USACE) levee design standards. Analyses related to water velocity and wind/wave action would be required to determine what measures would be necessary to prevent erosion. Most levees in the Red River Valley do not require any erosion prevention measures above establishment of vegetation.

Similar Posts:

Share this Post or Follow the FM Area Diversion Project
error