Doc date:  August 8, 2012

Editor’s notes:  Provides the USACE with prelim utility relocation plans for the north half of the Diversion Channel (Reaches 1-3) FM Metro Diversion Project.

Doc date:   August 27, 2012

Editor’s notes:  Provides the USACE with prelim utility relocation plans for the south half of the Diversion Channel (Reaches 4-7) FM Metro Diversion Project.

Similar Posts:

Share this Post or Follow the FM Area Diversion Project
error